SOLAR + STORAGE · WESTSolar + storage project T2-038, Wallowa County
Solar + storage project T2-038, Wallowa County is a 90.0 MW solar + storage request in interconnection study in the West interconnection queue, in Wallowa County, Oregon, connecting to PacifiCorp.
Queue statusIn planning
- PlanningQueued Sep 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- T2-038
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Hurricane substation
- Location
- Wallowa County, Oregon
- Technology
- Solar: 90.0 MW · Battery
- Total requested
- 90.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Active
- Entered queue
- 10 September 2025
- Proposed online date
- December 2026
Location
Marker shows the centre of Wallowa County; the queue data does not give exact sites.
Other requests in Wallowa County
- Onshore wind project 232, Wallowa CountyOnshore wind · 252 MW · withdrawn
- Solar + storage project C3-042, Wallowa CountySolar + storage · 90.0 MW · withdrawn
- Solar project 890, Wallowa CountySolar · 20.0 MW · withdrawn
- Solar project 676, Wallowa CountySolar · 10.0 MW · withdrawn
- Solar project 665, Wallowa CountySolar · 10.0 MW · withdrawn
- Solar project 675, Wallowa CountySolar · 10.0 MW · withdrawn
- Solar project 878, Wallowa CountySolar · 4.0 MW · withdrawn
- Solar project 1020, Wallowa CountySolar · 3.0 MW · withdrawn
- Solar project 992, Wallowa CountySolar · 3.0 MW · withdrawn
- Solar project 1077, Wallowa CountySolar · 2.9 MW · withdrawn
- Solar project 1007, Wallowa CountySolar · 0.9 MW · withdrawn
- Solar project 1121, Wallowa CountySolar · 0.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem