United States βΊ Grid βΊ Interconnection queues βΊ Oregon
SOLAR Β· WESTSolar project 23-237, Yamhill County
Solar project 23-237, Yamhill County is a 105 MW solar request withdrawn in the West interconnection queue, in Yamhill County, Oregon, connecting to Portland General Electric.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23-237
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Portland General Electric
- Connection point (POI)
- Springbrook Substation
- Location
- Yamhill County, Oregon
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 25 August 2023
- Proposed online date
- June 2026
Location
Marker shows the centre of Yamhill County; the queue data does not give exact sites.
Other requests in Yamhill County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem