United States › Grid › Interconnection queues › Pennsylvania

ONSHORE WIND · PJM

Kimberly Run Wind Farm

Kimberly Run Wind Farm is a 80.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Somerset County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2014 (completed)
  2. Withdrawn / abandonedJun 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AA1-046
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Somerset-Allegheny 115kV
Location
Somerset County, Pennsylvania
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
29 August 2014
Proposed online date
December 2018
Withdrawn
June 2018

Location

Marker shows the centre of Somerset County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Somerset County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem