United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMGreat Cove Solar
Great Cove Solar is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Fulton County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2020 (completed)
- Withdrawn / abandonedNov 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-116
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- McConnellsburg 138 kV
- Location
- Fulton County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 28 February 2020
- Proposed online date
- September 2027
- Withdrawn
- November 2024
Location
Marker shows the centre of Fulton County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Fulton County
- Solar project AH2-037, Fulton CountySolar Β· 5.0 MW Β· in study
- FU-Hanks SolarSolar Β· 15.7 MW Β· suspended
- Great Cover Solar LLCSolar Β· 70.0 MW Β· built
- Gas project H27_W72, Fulton CountyGas Β· 350 MW Β· withdrawn
- Gas project H27_W71, Fulton CountyGas Β· 252 MW Β· withdrawn
- Solar project AE1-132, Fulton CountySolar Β· 85.0 MW Β· withdrawn
- Spring Run SolarSolar Β· 70.0 MW Β· withdrawn
- Solar project AC1-211, Fulton CountySolar Β· 70.0 MW Β· withdrawn
- Cove Creek Solar ProjectSolar Β· 20.0 MW Β· withdrawn
- Onshore wind project Q07, Fulton CountyOnshore wind Β· 18.0 MW Β· withdrawn
- Onshore wind project Q05, Fulton CountyOnshore wind Β· 18.0 MW Β· withdrawn
- Onshore wind project Q06, Fulton CountyOnshore wind Β· 18.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem