United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 494, Rhea County
Solar + storage project 494, Rhea County is a 150 MW solar + storage request withdrawn in the Southeast interconnection queue, in Rhea County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 494
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Rhea County, Tennessee
- Technology
- Solar: 150 MW Β· Battery
- Total requested
- 150 MW
- Queue status
- Withdrawn
- Entered queue
- 14 April 2021
Location
Marker shows the centre of Rhea County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Rhea County
- Nuclear project 208, Rhea CountyNuclear Β· 1,183 MW Β· built
- Nuclear project 231, Rhea CountyNuclear Β· 57.0 MW Β· built
- Other project 180, Rhea CountyOther Β· 25.0 MW Β· built
- Nuclear project 259, Rhea CountyNuclear Β· 23.0 MW Β· built
- Other project 204, Rhea CountyOther Β· 11.0 MW Β· built
- Nuclear project 329, Rhea CountyNuclear Β· 5.0 MW Β· built
- Gas project 207, Rhea CountyGas Β· 1,183 MW Β· withdrawn
- Solar project 669, Rhea CountySolar Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem