United States βΊ Grid βΊ Interconnection queues βΊ Missouri
ONSHORE WIND Β· MISOOnshore wind project J1123, Audrain County
Onshore wind project J1123, Audrain County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Audrain County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1123
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Spencer Creek 345 kV Substation
- Location
- Audrain County, Missouri
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2021
- Withdrawn
- January 2020
Location
Marker shows the centre of Audrain County; the queue data does not give exact sites.
Other requests in Audrain County
- Onshore wind project J1026, Audrain CountyOnshore wind Β· 400 MW Β· agreement signed
- Onshore wind project J3929, Audrain CountyOnshore wind Β· 250 MW Β· in study
- Solar project J1363, Audrain CountySolar Β· 150 MW Β· withdrawn
- Onshore wind project J1338, Audrain CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project J1240, Audrain CountySolar Β· 135 MW Β· withdrawn
- Onshore wind project J658, Audrain CountyOnshore wind Β· 100 MW Β· withdrawn
- Gas project G847, Audrain CountyGas Β· 62.0 MW Β· withdrawn
- Solar project J3190, Audrain CountySolar Β· 50.0 MW Β· withdrawn
- Solar project J2981, Audrain CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem