πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

ONSHORE WIND Β· PJM

Onshore wind project AG1-509, Grayson County

Onshore wind project AG1-509, Grayson County is a 105 MW onshore wind request withdrawn in the PJM interconnection queue, in Grayson County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedMar 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-509
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Point Lookout 69 kV
Location
Grayson County, Virginia
Technology
Wind: 105 MW
Total requested
105 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
30 September 2020
Proposed online date
March 2025
Withdrawn
March 2022

Location

Marker shows the centre of Grayson County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Grayson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem