HYDRO · PJM

Fries Hydorelectric Plant

Fries Hydorelectric Plant is a 5.2 MW hydro request built and operating in the PJM interconnection queue, in Grayson County, Virginia, connecting to AEP.

Queue statusOperating
  1. PlanningQueued May 2005 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2006 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
O31
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Fries 12kV
Location
Grayson County, Virginia
Technology
Hydro: 5.2 MW
Total requested
5.2 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
18 May 2005
Proposed online date
December 2006
Came online
December 2006

Location

Marker shows the centre of Grayson County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Grayson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem