United States › Grid › Interconnection queues › Virginia
HYDRO · PJMFries Hydorelectric Plant
Fries Hydorelectric Plant is a 5.2 MW hydro request built and operating in the PJM interconnection queue, in Grayson County, Virginia, connecting to AEP.
Request details
- Queue ID
- O31
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Fries 12kV
- Location
- Grayson County, Virginia
- Technology
- Hydro: 5.2 MW
- Total requested
- 5.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 18 May 2005
- Proposed online date
- December 2006
- Came online
- December 2006
Location
Marker shows the centre of Grayson County; the queue data does not give exact sites.
Other requests in Grayson County