United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR + STORAGE Β· MISO

Solar + storage project J2118, Monroe County

Solar + storage project J2118, Monroe County is a 125 MW solar + storage request withdrawn in the MISO interconnection queue, in Monroe County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2118
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Whiting - Morocco 138kV
Location
Monroe County, Michigan
Technology
Solar: 125 MW Β· Battery
Total requested
125 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 3; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 September 2021
Proposed online date
October 2025
Withdrawn
September 2023

Location

Marker shows the centre of Monroe County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Monroe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem