United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
HYDRO Β· PJMHydro project V1-009
Hydro project V1-009 is a 12.0 MW hydro request withdrawn in the PJM interconnection queue, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2009 (completed)
- Withdrawn / abandonedAug 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- V1-009
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Gilbert 46kV
- Location
- West Virginia
- Technology
- Hydro: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 17 February 2009
- Proposed online date
- April 2012
- Withdrawn
- August 2009
Location
No county location in the queue data.
Power plants in West Virginia Β· Transmission lines in West Virginia
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem