BATTERY STORAGE Β· SPP

Battery storage project GEN-2019-048, Jackson County

Battery storage project GEN-2019-048, Jackson County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Jackson County, Missouri, connecting to KCPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2019-048
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
KCPL
Connection point (POI)
Duncan 69kV substation
Location
Jackson County, Missouri
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 May 2019
Proposed online date
December 2027
Withdrawn
January 2025

Location

Marker shows the centre of Jackson County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Jackson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem