United States βΊ Grid βΊ Interconnection queues βΊ Virginia
ONSHORE WIND Β· PJMOnshore wind project U2-051, Giles County
Onshore wind project U2-051, Giles County is a 60.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Giles County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedJan 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U2-051
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Glen Lyn-Wythe 138kV
- Location
- Giles County, Virginia
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 24 June 2008
- Proposed online date
- December 2010
- Withdrawn
- January 2011
Location
Marker shows the centre of Giles County; the queue data does not give exact sites.
Other requests in Giles County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem