United States βΊ Grid βΊ Interconnection queues βΊ Idaho
ONSHORE WIND Β· WESTOnshore wind project 28, Idaho County
Onshore wind project 28, Idaho County is a 102 MW onshore wind request withdrawn in the West interconnection queue, in Idaho County, Idaho, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedSep 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 28
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Grangeville-Nez Perce 115 kV line near Grangeville
- Location
- Idaho County, Idaho
- Technology
- Wind: 102 MW
- Total requested
- 102 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 10 June 2010
- Proposed online date
- December 2012
- Withdrawn
- September 2010
Location
Marker shows the centre of Idaho County; the queue data does not give exact sites.
Other requests in Idaho County
- Other project ELKC, Idaho CountyOther Β· 2.0 MW Β· built
- Hydro project 521, Idaho CountyHydro Β· 0.2 MW Β· built
- Onshore wind project 15, Idaho CountyOnshore wind Β· 120 MW Β· withdrawn
- Onshore wind project 10, Idaho CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project 7, Idaho CountyOnshore wind Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem