United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

ONSHORE WIND Β· WEST

Onshore wind project 7, Idaho County

Onshore wind project 7, Idaho County is a 60.0 MW onshore wind request withdrawn in the West interconnection queue, in Idaho County, Idaho, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2007 (completed)
  2. Withdrawn / abandonedJun 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
7
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Grangeville-Nez Perce 115 kV line near Grangeville
Location
Idaho County, Idaho
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
12 October 2007
Proposed online date
October 2010
Withdrawn
June 2008

Location

Marker shows the centre of Idaho County; the queue data does not give exact sites.

Power plants in Idaho Β· Transmission lines in Idaho

Other requests in Idaho County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem