United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project W1-073, Caroline County
Gas project W1-073, Caroline County is a 612 MW gas request withdrawn in the PJM interconnection queue, in Caroline County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2010 (completed)
- Withdrawn / abandonedAug 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W1-073
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Ladysmith CT 230kV
- Location
- Caroline County, Virginia
- Technology
- Gas: 612 MW
- Total requested
- 612 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 27 April 2010
- Proposed online date
- June 2014
- Withdrawn
- August 2010
Location
Marker shows the centre of Caroline County; the queue data does not give exact sites.
Other requests in Caroline County
- Battery storage project AI2-001, Caroline CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AH2-083, Caroline CountyBattery storage Β· 140 MW Β· in study
- Battery storage project AI2-230, Caroline CountyBattery storage Β· 120 MW Β· in study
- Solar project AJ1-020, Caroline CountySolar Β· 86.4 MW Β· in study
- Solar project AJ1-021, Caroline CountySolar Β· 16.2 MW Β· in study
- CC Solar ISolar Β· 120 MW Β· suspended
- Ladysmith CT Units 3 & 4Gas Β· 340 MW Β· built
- Ladysmith Combustion Turbine Unit 5Gas Β· 170 MW Β· built
- Ladysmith Unit 4Other Β· 20.0 MW Β· built
- Ladysmith Unit 5Other Β· 20.0 MW Β· built
- Ladysmith Unit 3Other Β· 20.0 MW Β· built
- Ladysmith Combustion Turbines Unit 1Gas Β· 19.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem