United States › Grid › Interconnection queues › Virginia
GAS · PJMLadysmith CT Units 3 & 4
Ladysmith CT Units 3 & 4 is a 340 MW gas request built and operating in the PJM interconnection queue, in Caroline County, Virginia, connecting to Dominion.
Request details
- Queue ID
- R19
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Ladysmith 230kV
- Location
- Caroline County, Virginia
- Technology
- Gas: 340 MW
- Total requested
- 340 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 3 October 2006
- Proposed online date
- June 2008
- Came online
- June 2008
Location
Marker shows the centre of Caroline County; the queue data does not give exact sites.
Other requests in Caroline County
- Battery storage project AI2-001, Caroline CountyBattery storage · 150 MW · in study
- Battery storage project AH2-083, Caroline CountyBattery storage · 140 MW · in study
- Battery storage project AI2-230, Caroline CountyBattery storage · 120 MW · in study
- Solar project AJ1-020, Caroline CountySolar · 86.4 MW · in study
- Solar project AJ1-021, Caroline CountySolar · 16.2 MW · in study
- CC Solar ISolar · 120 MW · suspended
- Ladysmith Combustion Turbine Unit 5Gas · 170 MW · built
- Ladysmith Unit 4Other · 20.0 MW · built
- Ladysmith Unit 5Other · 20.0 MW · built
- Ladysmith Unit 3Other · 20.0 MW · built
- Ladysmith Combustion Turbines Unit 1Gas · 19.0 MW · built
- Ladysmith Combustion Turbines Unit 2Gas · 19.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem