ONSHORE WIND Β· MISOOnshore wind project J2915, Clark County
Onshore wind project J2915, Clark County is a 223 MW onshore wind request withdrawn in the MISO interconnection queue, in Clark County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2915
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- Other_
- Location
- Clark County, Missouri
- Technology
- Wind: 223 MW
- Total requested
- 223 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- July 2028
- Withdrawn
- October 2025
Location
Marker shows the centre of Clark County; the queue data does not give exact sites.
Other requests in Clark County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem