BATTERY STORAGE Β· MISOBattery storage project J2549, Clark County
Battery storage project J2549, Clark County is a 75.0 MW battery storage request withdrawn in the MISO interconnection queue, in Clark County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2549
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- Sub T to Maywood 345kV line
- Location
- Clark County, Missouri
- Technology
- Battery: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- July 2027
- Withdrawn
- March 2023
Location
Marker shows the centre of Clark County; the queue data does not give exact sites.