United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AG2-203, City Of Lynchburg County
Battery storage project AG2-203, City Of Lynchburg County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in City Of Lynchburg County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-203
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Perkins Park 12.47 kV
- Location
- City Of Lynchburg County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 March 2021
- Proposed online date
- October 2022
- Withdrawn
- December 2024
Location
Marker shows the centre of City Of Lynchburg County; the queue data does not give exact sites.
Other requests in City Of Lynchburg County
- Reusens Hydro Electric Generating PlantHydro Β· 12.5 MW Β· built
- Battery storage project AG2-202, City Of Lynchburg CountyBattery storage Β· 20.0 MW Β· withdrawn
- Other project Y3-119, City Of Lynchburg CountyOther Β· 19.0 MW Β· withdrawn
- CO-Zaners RohrsburgSolar + storage Β· 3.0 MW Β· withdrawn
- LH ChurchSolar + storage Β· 3.0 MW Β· withdrawn
- CO-RidgeSolar + storage Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem