United States βΊ Grid βΊ Interconnection queues βΊ Alabama
GAS Β· SOUTHEASTGas project IC-772, Tallapoosa County
Gas project IC-772, Tallapoosa County is a 661 MW gas request withdrawn in the Southeast interconnection queue, in Tallapoosa County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2019 (completed)
- Withdrawn / abandonedJun 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-772
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Hillabee Switching Station
- Location
- Tallapoosa County, Alabama
- Technology
- Gas: 661 MW
- Total requested
- 661 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 6 February 2019
- Withdrawn
- June 2019
Location
Marker shows the centre of Tallapoosa County; the queue data does not give exact sites.
Other requests in Tallapoosa County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem