United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 457, Polk County
Solar + storage project 457, Polk County is a 100 MW solar + storage request withdrawn in the Southeast interconnection queue, in Polk County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 457
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Polk County, Tennessee
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 3 September 2020
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Polk County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem