SOLAR Β· PJM

Solar project AG1-420, Butler County

Solar project AG1-420, Butler County is a 70.0 MW solar request withdrawn in the PJM interconnection queue, in Butler County, Pennsylvania, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedSep 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-420
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Campbell-Kiesters 138 kV
Location
Butler County, Pennsylvania
Technology
Solar: 70.0 MW
Total requested
70.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
30 September 2020
Proposed online date
December 2023
Withdrawn
September 2024

Location

Marker shows the centre of Butler County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Butler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem