United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· MISOBattery storage project J2724, Shelby County
Battery storage project J2724, Shelby County is a 300 MW battery storage request withdrawn in the MISO interconnection queue, in Shelby County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2724
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- 7NEOGA-7HOLLAND 345 kV
- Location
- Shelby County, Illinois
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- June 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Shelby County; the queue data does not give exact sites.
Other requests in Shelby County
- Onshore wind project J3521, Shelby CountyOnshore wind Β· 350 MW Β· in study
- Onshore wind project J3901, Shelby CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project J2049, Shelby CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J3947, Shelby CountyBattery storage Β· 200 MW Β· in study
- Solar project J2384, Shelby CountySolar Β· 125 MW Β· in study
- Battery storage project J2376, Shelby CountyBattery storage Β· 60.0 MW Β· in study
- Solar project J3818, Shelby CountySolar Β· 40.0 MW Β· in study
- Gas project G500, Shelby CountyGas Β· 710 MW Β· withdrawn
- Onshore wind project J1702, Shelby CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project J1837, Shelby CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J3671, Shelby CountySolar Β· 120 MW Β· withdrawn
- Onshore wind project G623, Shelby CountyOnshore wind Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem