United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR + STORAGE Β· PJM

Solar + storage project AG2-160, Adair County

Solar + storage project AG2-160, Adair County is a 53.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Adair County, Kentucky, connecting to EKPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-160
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
EKPC
Location
Adair County, Kentucky
Technology
Solar: 53.0 MW Β· Battery
Total requested
53.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
25 February 2021
Proposed online date
September 2023
Withdrawn
March 2021

Location

Marker shows the centre of Adair County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Adair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem