United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
ONSHORE WIND Β· MISOOnshore wind project G691, Vernon County
Onshore wind project G691, Vernon County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Vernon County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2006 (completed)
- Withdrawn / abandonedNov 2009 (project stopped here)
- ConsentedNov 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G691
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Westby - Cashton Tap 69 kV
- Location
- Vernon County, Wisconsin
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 16 October 2006
- Agreement signed
- 17 November 2009
- Proposed online date
- July 2007
- Withdrawn
- November 2009
Location
Marker shows the centre of Vernon County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem