SOLAR Β· MISOSolar project J3403, Macon County
Solar project J3403, Macon County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Macon County, Missouri, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3403
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- Other_
- Location
- Macon County, Missouri
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 April 2024
- Proposed online date
- August 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Macon County; the queue data does not give exact sites.