United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2016-073, Kingman County
Onshore wind project GEN-2016-073, Kingman County is a 220 MW onshore wind request withdrawn in the SPP interconnection queue, in Kingman County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingOct 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2016-073
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV
- Location
- Kingman County, Kansas
- Technology
- Wind: 220 MW
- Total requested
- 220 MW
- Service type
- Energy only (ERIS)
- Study phase
- TERMINATED
- Queue status
- Withdrawn
- Entered queue
- 30 March 2016
- Proposed online date
- October 2025
- Came online
- October 2025
Location
Marker shows the centre of Kingman County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem