United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

Locke Solar Farm

Locke Solar Farm is a 19.8 MW solar request withdrawn in the NYISO interconnection queue, in Cayuga County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandonedOct 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1218
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Farm East LLC
Connection point (POI)
NYS-Locke 718 Substation
Location
Cayuga County, New York
Technology
Solar: 19.8 MW
Total requested
19.8 MW
Queue status
Withdrawn
Entered queue
12 July 2021
Withdrawn
October 2021

Location

Marker shows the centre of Cayuga County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Cayuga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem