United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
BATTERY STORAGE Β· PJMBattery storage project AA2-114, Union County
Battery storage project AA2-114, Union County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Union County, New Jersey, connecting to JCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedMay 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-114
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- JCPL
- Connection point (POI)
- Furnace Brook-Hazen Switch Point 34kV
- Location
- Union County, New Jersey
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 28 April 2015
- Proposed online date
- April 2016
- Withdrawn
- May 2016
Location
Marker shows the centre of Union County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Union County
- Gas project AH1-722, Union CountyGas Β· 158 MW Β· in study
- Gas project AH1-715, Union CountyGas Β· 149 MW Β· in study
- Linden 1, 2 & 3Gas Β· 750 MW Β· built
- Linden 1, 2 & 3Gas Β· 436 MW Β· built
- Tosco #6Gas Β· 180 MW Β· built
- Linden 5 & 6Gas Β· 120 MW Β· built
- Linden Generating StationGas Β· 61.0 MW Β· built
- Linden Generating StationGas Β· 47.0 MW Β· built
- Linden 1 & 2Gas Β· 44.0 MW Β· built
- Linden Generating StationGas Β· 36.0 MW Β· built
- Linden Generating StationGas Β· 23.0 MW Β· built
- Tosco #6Gas Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem