United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

SOLAR Β· WEST

Solar project PIS078, Power County

Solar project PIS078, Power County is a 100 MW solar request withdrawn in the West interconnection queue, in Power County, Idaho, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PIS078
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
PacifiCorp
Connection point (POI)
American Falls Malad transmission line
Location
Power County, Idaho
Technology
Solar: 100 MW
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
14 June 2024
Proposed online date
December 2029

Location

Marker shows the centre of Power County; the queue data does not give exact sites.

Power plants in Idaho Β· Transmission lines in Idaho

Other requests in Power County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem