United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J2862, Bradley County
Solar project J2862, Bradley County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Bradley County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2862
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- AECC Hermitage South-Hilo 115kV
- Location
- Bradley County, Arkansas
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- August 2027
- Withdrawn
- March 2023
Location
Marker shows the centre of Bradley County; the queue data does not give exact sites.
Other requests in Bradley County
- Solar project J2639, Bradley CountySolar Β· 106 MW Β· in study
- Solar project J2977, Bradley CountySolar Β· 150 MW Β· withdrawn
- Solar project J858, Bradley CountySolar Β· 140 MW Β· withdrawn
- Solar project J661, Bradley CountySolar Β· 90.0 MW Β· withdrawn
- Solar project J377, Bradley CountySolar Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem