United States › Grid › Interconnection queues › Indiana

BATTERY STORAGE · MISO

Battery storage project J2280

Battery storage project J2280 is a 198 MW battery storage request in interconnection study in the MISO interconnection queue, connecting to DUKE ENERGY INDIANA.

Queue statusIn planning
  1. PlanningQueued Mar 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2280
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
GREENWOOD CLARK TOWNSHIP
Location
Indiana
Technology
Battery: 198 MW
Total requested
198 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
28 March 2022
Proposed online date
June 2023

Location

No county location in the queue data.

Power plants in Indiana · Transmission lines in Indiana

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem