ONSHORE WIND Β· SPPOnshore wind project GEN-2023-085, Douglas County
Onshore wind project GEN-2023-085, Douglas County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Douglas County, Missouri, connecting to SWPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-085
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SWPA
- Connection point (POI)
- Mansfield - Logan 161 kV Line
- Location
- Douglas County, Missouri
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2026
- Withdrawn
- August 2025
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem