United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR + STORAGE Β· MISOSolar + storage project J2855, Lawrence County
Solar + storage project J2855, Lawrence County is a 100 MW solar + storage request withdrawn in the MISO interconnection queue, in Lawrence County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2855
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Bedford - Edwardsport 138 kV line
- Location
- Lawrence County, Indiana
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- March 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of Lawrence County; the queue data does not give exact sites.
Other requests in Lawrence County
- Gas project G084, Lawrence CountyGas Β· 320 MW Β· built
- Gas project G015, Lawrence CountyGas Β· 800 MW Β· withdrawn
- Other project G029, Lawrence CountyOther Β· 500 MW Β· withdrawn
- Solar project J1697, Lawrence CountySolar Β· 200 MW Β· withdrawn
- Solar project J1565, Lawrence CountySolar Β· 200 MW Β· withdrawn
- Solar project J1694, Lawrence CountySolar Β· 100 MW Β· withdrawn
- Other project G290, Lawrence CountyOther Β· 86.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem