United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

BATTERY STORAGE Β· WEST

Battery storage project C3-136, Tooele County

Battery storage project C3-136, Tooele County is a 160 MW battery storage request withdrawn in the West interconnection queue, in Tooele County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C3-136
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Sheep Lane substation
Location
Tooele County, Utah
Technology
Battery: 160 MW
Total requested
160 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
15 May 2023
Proposed online date
December 2027

Location

Marker shows the centre of Tooele County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Tooele County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem