GAS Β· PJMElgin Energy Center
Elgin Energy Center is a 16.0 MW gas request built and operating in the PJM interconnection queue, in Kane County, Illinois, connecting to ComEd.
Request details
- Queue ID
- T74
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Elgin
- Location
- Kane County, Illinois
- Technology
- Gas: 16.0 MW
- Total requested
- 16.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 26 September 2007
- Proposed online date
- September 2007
- Came online
- January 2013
Location
Marker shows the centre of Kane County; the queue data does not give exact sites.
Other requests in Kane County
- Battery storage project AI1-156, Kane CountyBattery storage Β· 170 MW Β· in study
- Battery storage project AI2-007, Kane CountyBattery storage Β· 40.0 MW Β· in study
- City of Geneva Units 1-5Gas Β· 29.0 MW Β· built
- Battery storage project AB1-085, Kane CountyBattery storage Β· 20.0 MW Β· withdrawn
- Gas project AF1-072, Kane CountyGas Β· 17.2 MW Β· withdrawn
- Gas project AE2-312, Kane CountyGas Β· 7.0 MW Β· withdrawn
- Other project Q16, Kane CountyOther Β· 6.6 MW Β· withdrawn
- Other project Q12, Kane CountyOther Β· 1.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem