ONSHORE WIND Β· WESTOnshore wind project GI-0407, O'brien County
Onshore wind project GI-0407, O'brien County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in O'brien County, Iowa, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0407
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Primghar
- Location
- O'brien County, Iowa
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 2 July 2004
Location
Marker shows the centre of O'brien County; the queue data does not give exact sites.
Other requests in O'brien County
- Onshore wind project R39, O'brien CountyOnshore wind Β· 500 MW Β· built
- Onshore wind project J285, O'brien CountyOnshore wind Β· 250 MW Β· built
- Onshore wind project J072, O'brien CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0320, O'brien CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J297, O'brien CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H040, O'brien CountyOnshore wind Β· 81.0 MW Β· withdrawn
- Other project G316, O'brien CountyOther Β· 80.0 MW Β· withdrawn
- Onshore wind project GI-0304, O'brien CountyOnshore wind Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem