SOLAR Β· PJMSolar project AH1-011, Brooke County
Solar project AH1-011, Brooke County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Brooke County, West Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-011
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Fulton - Tidd 69 kV
- Location
- Brooke County, West Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 19 April 2021
- Proposed online date
- December 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Brooke County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Brooke County
- ESC Brooke County Power IGas Β· 685 MW Β· withdrawn
- Gas project AF1-065, Brooke CountyGas Β· 100 MW Β· withdrawn
- ESC Brooke County Power IGas Β· 80.0 MW Β· withdrawn
- ESC Brooke County Power I, LLCGas Β· 65.0 MW Β· withdrawn
- Solar project AH1-118, Brooke CountySolar Β· 20.0 MW Β· withdrawn
- Other project U2-025, Brooke CountyOther Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem