ONSHORE WIND Β· MISOOnshore wind project G981, Grant County
Onshore wind project G981, Grant County is a 19.5 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandonedNov 2011 (project stopped here)
- ConsentedNov 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G981
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- New IC owned sbstn tapping into a 69kV MDU line at N46? 19' 8" / W101? 54' 45"
- Location
- Grant County, North Dakota
- Technology
- Wind: 19.5 MW
- Total requested
- 19.5 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 10 March 2008
- Agreement signed
- 15 November 2011
- Proposed online date
- December 2011
- Withdrawn
- November 2011
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem