United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AA1-081, Howard County
Solar project AA1-081, Howard County is a 3.0 MW solar request withdrawn in the PJM interconnection queue, in Howard County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2014 (completed)
- Withdrawn / abandonedMay 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA1-081
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Cooksville 13kV
- Location
- Howard County, Maryland
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 24 October 2014
- Proposed online date
- May 2016
- Withdrawn
- May 2015
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Solar project AB2-124, Howard CountySolar Β· 5.0 MW Β· withdrawn
- Solar project AB2-123, Howard CountySolar Β· 5.0 MW Β· withdrawn
- Solar project AE2-070, Howard CountySolar Β· 4.0 MW Β· withdrawn
- Solar project Y1-045, Howard CountySolar Β· 2.0 MW Β· withdrawn
- Solar project V3-002, Howard CountySolar Β· 1.2 MW Β· withdrawn
- Battery storage project AB1-049, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-047, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-050, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-040, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-036, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
- Solar project W4-030, Howard CountySolar Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-044, Howard CountyBattery storage Β· 0.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem