United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR Β· WESTSolar project G0632, Grant County
Solar project G0632, Grant County is a 300 MW solar request withdrawn in the West interconnection queue, in Grant County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0632
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- BPA's Vantage 230 kV Substation
- Location
- Grant County, Washington
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 4 November 2019
- Proposed online date
- November 2022
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Grant County
- Solar + storage project 5, Grant CountySolar + storage Β· 130 MW Β· agreement signed
- Solar + storage project 1, Grant CountySolar + storage Β· 120 MW Β· agreement signed
- Gas project G0760, Grant CountyGas Β· 990 MW Β· in study
- Solar project G1032, Grant CountySolar Β· 500 MW Β· in study
- Solar + storage project G0668, Grant CountySolar + storage Β· 500 MW Β· in study
- Battery storage project G0656, Grant CountyBattery storage Β· 500 MW Β· in study
- Solar + storage project G0744, Grant CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project 9, Grant CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project G1047, Grant CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project G0660, Grant CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project G1043, Grant CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project 10, Grant CountySolar + storage Β· 300 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem