BATTERY STORAGE Β· WESTBattery storage project 143, King County
Battery storage project 143, King County is a 100 MW battery storage request withdrawn in the West interconnection queue, in King County, Washington, connecting to Puget Sound Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 143
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Puget Sound Energy
- Connection point (POI)
- White River βΓΓ¬ Baldi 230kV Transmission Line
- Location
- King County, Washington
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 12 April 2024
- Proposed online date
- May 2027
Location
Marker shows the centre of King County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in King County
- Battery storage project G1014, King CountyBattery storage Β· 250 MW Β· in study
- Battery storage project 139, King CountyBattery storage Β· 130 MW Β· in study
- Battery storage project 148, King CountyBattery storage Β· 100 MW Β· in study
- Battery storage project 99, King CountyBattery storage Β· 250 MW Β· suspended
- Battery storage project 101, King CountyBattery storage Β· 200 MW Β· suspended
- Battery storage project 121, King CountyBattery storage Β· 125 MW Β· suspended
- Hydro project 31, King CountyHydro Β· 8.3 MW Β· built
- Hydro project 31 (PSE Merchant)Hydro Β· 8.3 MW Β· built
- Hydro project 91, King CountyHydro Β· 6.5 MW Β· built
- Hydro project 92, King CountyHydro Β· 6.5 MW Β· built
- Hydro project 34, King CountyHydro Β· 6.0 MW Β· built
- Hydro project 33, King CountyHydro Β· 6.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem