United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR + STORAGE Β· PJMSolar + storage project AF2-245, Mason County
Solar + storage project AF2-245, Mason County is a 132 MW solar + storage request withdrawn in the PJM interconnection queue, in Mason County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedAug 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-245
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Spurlock-Flemingsburg 138 kV
- Location
- Mason County, Kentucky
- Technology
- Solar: 132 MW Β· Battery
- Total requested
- 132 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 27 March 2020
- Proposed online date
- June 2023
- Withdrawn
- August 2020
Location
Marker shows the centre of Mason County; the queue data does not give exact sites.
Other requests in Mason County
- Goldfinch SolarSolar Β· 250 MW Β· agreement signed
- Solar + storage project LGE-GIS-2021-017, Mason CountySolar + storage Β· 100 MW Β· suspended
- Mason Energy CenterGas Β· 1,150 MW Β· withdrawn
- Battery storage project AH1-756, Mason CountyBattery storage Β· 250 MW Β· withdrawn
- Solar project AE2-235, Mason CountySolar Β· 60.0 MW Β· withdrawn
- Solar project LGE-GIS-2019-026, Mason CountySolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem