United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 110 MW solar request withdrawn in the ISO-NE interconnection queue, in Carroll County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
932
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley.
Location
Carroll County, New Hampshire
Technology
Solar: 110 MW
Total requested
110 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
22 October 2019
Proposed online date
October 2025
Withdrawn
November 2022

Location

Marker shows the centre of Carroll County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Carroll County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem