United States › Grid › Interconnection queues › New Hampshire
SOLAR + STORAGE · ISO-NESolar plus battery storage
Solar plus battery storage is a 85.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Carroll County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2020 (completed)
- Withdrawn / abandonedAug 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1036
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV bus at Eversource's White Lake Substation in Tamworth, New Hampshire (43.848851, -71.2444465)
- Location
- Carroll County, New Hampshire
- Technology
- Solar: 85.0 MW · Battery
- Total requested
- 85.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 20 July 2020
- Proposed online date
- October 2023
- Withdrawn
- August 2020
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem