ONSHORE WIND Β· MISOOnshore wind project J016, Steele County
Onshore wind project J016, Steele County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Steele County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2009 (completed)
- Withdrawn / abandonedJun 2009 (project stopped here)
- ConsentedJun 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J016
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- SMMPA W. Faribault - Owatonna 115kV
- Location
- Steele County, Minnesota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 6 January 2009
- Agreement signed
- 23 June 2009
- Proposed online date
- December 2012
- Withdrawn
- June 2009
Location
Marker shows the centre of Steele County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Steele County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem