Onshore wind project H047, Steele County is a 35.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Steele County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedJun 2012 (project stopped here)
- ConsentedJun 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H047
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ITC Midwest Medford Junction 69 kV Substation
- Location
- Steele County, Minnesota
- Technology
- Wind: 35.0 MW
- Total requested
- 35.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 12 June 2008
- Agreement signed
- 26 June 2012
- Proposed online date
- December 2011
- Withdrawn
- June 2012
Location
Marker shows the centre of Steele County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Steele County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem