BATTERY STORAGE · PJMCedar Energy Center
Cedar Energy Center is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in City Of Chesapeake County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-057
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Grassfield 34.5 kV
- Location
- City Of Chesapeake County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 22 January 2020
- Proposed online date
- December 2024
- Withdrawn
- November 2023
Location
Marker shows the centre of City Of Chesapeake County; the queue data does not give exact sites.
Other requests in City Of Chesapeake County
- Cvow 2, Oss 2 ‚Äì T2G07Offshore wind · 836 MW · in study
- Cvow 1, Oss 1 - T1L11Offshore wind · 833 MW · in study
- Cvow 3, Oss 3 ‚Äì T3G15Offshore wind · 820 MW · in study
- Battery storage project AH2-133, City Of Chesapeake CountyBattery storage · 300 MW · in study
- Battery storage project AH2-330, City Of Chesapeake CountyBattery storage · 100 MW · in study
- Yadkins Energy CenterBattery storage · 100 MW · in study
- Battery storage project AH2-241, City Of Chesapeake CountyBattery storage · 45.0 MW · in study
- Shillelagh SolarSolar · 118 MW · built
- Bedford Solar CenterSolar · 70.0 MW · built
- Elizabeth River GT3Gas · 20.0 MW · built
- Elizabeth River GT1Gas · 20.0 MW · built
- Solar project AC1-147, City Of Chesapeake CountySolar · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem