United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR Β· SOUTHEASTShellman Solar
Shellman Solar is a 100 MW solar request withdrawn in the Southeast interconnection queue, in Randolph County, Georgia, connecting to Georgia Transmission.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-112
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Cuthbert Pr βΓΓ¬ Dawson Pr 115 kV
- Location
- Randolph County, Georgia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 2 July 2018
- Proposed online date
- November 2022
Location
Marker shows the centre of Randolph County; the queue data does not give exact sites.
Other requests in Randolph County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem