πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

SOLAR Β· SOUTHEAST

Shellman Solar

Shellman Solar is a 100 MW solar request withdrawn in the Southeast interconnection queue, in Randolph County, Georgia, connecting to Georgia Transmission.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-112
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Cuthbert Pr β€šΓ„Γ¬ Dawson Pr 115 kV
Location
Randolph County, Georgia
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
2 July 2018
Proposed online date
November 2022

Location

Marker shows the centre of Randolph County; the queue data does not give exact sites.

Power plants in Georgia Β· Transmission lines in Georgia

Other requests in Randolph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem