United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project T2-092, Millard County

Onshore wind project T2-092, Millard County is a 600 MW onshore wind request withdrawn in the West interconnection queue, in Millard County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
T2-092
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Red Butte Sigurd #2 transmission line
Location
Millard County, Utah
Technology
Wind: 600 MW
Total requested
600 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
12 September 2025
Proposed online date
September 2028

Location

Marker shows the centre of Millard County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Millard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem